Sunday, January 01, 2017

Hooker St. Skybridge


View Larger Map

The next bridge we're looking at is yet another pedestrian bridge. This one crosses Naito Parkway at SW Hooker St., connecting the Lair Hill neighborhood with the so-called "Bermuda Triangle" area that's home to the local naturopathic college. There's no actual intersection here, since this stretch of Naito is a 1940s-era quasi-freeway, and the the skybridge is one of the only ways in or out of the Bermuda Triangle, along with the creepy Arthur St. Tunnel.

The school's master plan notes the bridge is one of the main ways for students to access the campus, and points out that the bridge is quite old and not ADA-compliant. The bridge has been there much longer than the current school, in fact; it was previously home to PCC's Ross Island Center for a couple of decades, and before that it began life as Portland's amusingly named Failing Elementary School (named for pioneer Josiah Failing, also the namesake of NE Portland's Failing Pedestrian Bridge). I figured the bridge had probably been built for schoolkids, so I dug into the library's Oregonian database again. In a October 2nd 1947 article, school administrators & parents were clamoring for a new pedestrian bridge, since the state was in the middle of turning Front Avenue (now Naito) into a nice modern superhighway. The State Highway Department included such a bridge in their initial plan for the highway, but hadn't contracted anyone to build it, and they favored dropping the idea because it might cost up to $50,000. It seems the state also believed kids wouldn't actually use a pedestrian bridge if one was built, & would rather just dart across the busy highway or something, apparently. Neighbors pointed out that the closest library & playground were on the far side of Front, as was the Neighborhood House afterschool program, so over half of the school's students were likely to need to cross the new state superhighway at some point during the school day.

In a May 25th 1948 article, the state finally gave in and agreed to build a bridge, contracting with the lowest bidder for exactly $17,390.95, although the headline rounded it up by a nickel. You have to admit it looks like something built nearly 70 years ago by the lowest bidder, though it's best not to think about this while walking across the thing.

Unfortunately the delay meant the bridge wouldn't be ready by the start of the 1948 school year, and a September 5th, 1948 article explained the temporary, circuitous safe ways to school until the bridge was completed around November 1st, complete with lots of police and crossing guards everywhere.

The state's weird reluctance and penny-pinching around an obvious child safety issue might be explained by demographics, since this part of South Portland was a poor/working class, largely immigrant neighborhood at the time, as it was for much of the early to mid 20th century. I imagine the state would've preferred to just bulldoze the whole neighborhood in the name of Progress, like they later did in the South Auditorium area further north, and the largely African-American Albina business district in NE Portland.